|
Sand rafts - a photo essay |
|
|
|
Page 5 of 6

The sand is shifted manually from the rafts to the bank. There are no cranes or heavy machinery here.

Gravel is heavier than sand, and doesn’t raise such a good price. But it can still be sold by the truckload.

It only takes 20-30 minutes to shift the sand from the riverbank to the truck. The workers are paid once it has been moved.
|